PERENCANAAN JADWAL INDUK PRODUKSI DENGAN MENGGUNAKAN LINIER PROGRAMMING PADA INDUSTRI MANUFAKTUR PT ”X”

Authors

  • Yusuf Eko Nurcahyo Politeknik 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.30996/he.v12i02.630

Abstract

The fluctuated demand is one of constrain in planning and scheduling process because it affects the cost of production and inventory costs incurred. PT "X" is a sandal maker manufacturing industry that produces sandals and slippers men women. In the manufacture of slippers companies often do not correspond to the amount of consumer demand, so common advantages and disadvantages of production quantities. Master production scheduling (MPS) is a solution to overcome the problem of making sandals to avoid excess and shortage of production of slippers. To create a Master Production Schedule first made a forecast for the next planning period is 5 months of January, February, March, April, May and June.
Keyword: Master Production Schedule, linier programming

Downloads

Download data is not yet available.

References

AAhad M. Osman-Gani, Junaidah Hashim, Yusof Ismail (2010) Effects of Religiosity,

Spirituality, and Personal Values on Employee Performance: A Conceptual Analysis,

Presented at: 9th International Conference of the Academy of HRD (Asia Chapter), November 11 –

November 14, 2010,Organized by Academy of HRD (Asia Chapter), Shanghai, E-mail:

aosmangani@gmail.com

Aaker A, Kumar V and Day G.S, (2001), Marketing Research, Seventh edition, New York :

John Wiley & Sons Inc.

Abdullah, Ma‟ruf (2012) Manajemen berbasis syariah, Penerbit Aswaja Pressindo, Yogyakarta.

Downloads

Published

2016-03-24

How to Cite

Nurcahyo, Y. E. (2016). PERENCANAAN JADWAL INDUK PRODUKSI DENGAN MENGGUNAKAN LINIER PROGRAMMING PADA INDUSTRI MANUFAKTUR PT ”X”. Heuristic, 12(02). https://doi.org/10.30996/he.v12i02.630

Issue

Section

Articles