PERENCANAAN JADWAL INDUK PRODUKSI DENGAN MENGGUNAKAN LINIER PROGRAMMING PADA INDUSTRI MANUFAKTUR PT ”X”

  • Yusuf Eko Nurcahyo Politeknik 17 Agustus 1945 Surabaya

Abstract

The fluctuated demand is one of constrain in planning and scheduling process because it affects the cost of production and inventory costs incurred. PT "X" is a sandal maker manufacturing industry that produces sandals and slippers men women. In the manufacture of slippers companies often do not correspond to the amount of consumer demand, so common advantages and disadvantages of production quantities. Master production scheduling (MPS) is a solution to overcome the problem of making sandals to avoid excess and shortage of production of slippers. To create a Master Production Schedule first made a forecast for the next planning period is 5 months of January, February, March, April, May and June.
Keyword: Master Production Schedule, linier programming

Downloads

Download data is not yet available.

References

Astana, dan Yudha I.N., 2007, Perencanaan Persediaan Bahan Baku Berdasarkan Metode MRP (Material Requirement Planning). Jurnal Ilmiah Teknik Sipil Vol.11, No.2.

Baroto, T., 2002, Perencanaan dan Pengendalian Produksi. Ghalia Indonesia.

Biegel, J. E., 2009, Production Control Aquantitatif Approach. CV. Akademika Pressindo anggota IKAPI.

Fogarty, D.W., Blackstone, J.H., dan Hoffman, T.R., 1991, Production and Inventory Management. 2nd Edition, South-Western Publishing Co.

Kusuma, H., 2009, Perencanaan dan Pengendalian Produksi. Andi Yogyakarta

Nasution, A, H., 1999, Perencanaan dan Pengendalian Produksi. Guna Widya.

Published
2016-03-24
How to Cite
Nurcahyo, Y. (2016). PERENCANAAN JADWAL INDUK PRODUKSI DENGAN MENGGUNAKAN LINIER PROGRAMMING PADA INDUSTRI MANUFAKTUR PT ”X”. Heuristic, 12(02). https://doi.org/10.30996/he.v12i02.630
Section
Articles