[1]
Saputro, I. and Mundar, S. i 2017. PENJADWALAN MESIN PADA SISTEM PRODUKSI FLOW SHOP UNTUK MEMINIMALKAN KETERLAMBATAN. Heuristic. 14, 01 (Apr. 2017). DOI:https://doi.org/10.30996/he.v14i01.1043.