[1]
Putri, F. and Nugraha, I. 2025. Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ. Heuristic. 21, 2 (Jan. 2025), 173-186. DOI:https://doi.org/10.30996/heuristic.v21i2.12401.