Saputro, I., & Mundar, S. i. (2017). PENJADWALAN MESIN PADA SISTEM PRODUKSI FLOW SHOP UNTUK MEMINIMALKAN KETERLAMBATAN. Heuristic, 14(01). https://doi.org/10.30996/he.v14i01.1043