Putri, F., & Nugraha, I. (2025). Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ. Heuristic, 21(2), 173-186. https://doi.org/10.30996/heuristic.v21i2.12401