Abdulrahim, M., & Herlina, H. (2025). Production Line Arrangement to Increase Output in order to Meet PT. DMR’s Delivery Time in Surabaya. Heuristic, 22(1), 111 - 120. https://doi.org/10.30996/heuristic.v22i1.132379