PUTRI, F.; NUGRAHA, I. Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ. Heuristic, v. 21, n. 2, p. 173-186, 13 jan. 2025.