Putri, Firda, and Isna Nugraha. 2025. “Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ”. Heuristic 21 (2), 173-86. https://doi.org/10.30996/heuristic.v21i2.12401.