Saputro, I. and Mundar, S. i (2017) “PENJADWALAN MESIN PADA SISTEM PRODUKSI FLOW SHOP UNTUK MEMINIMALKAN KETERLAMBATAN”, Heuristic, 14(01). doi: 10.30996/he.v14i01.1043.