Putri, F. and Nugraha, I. (2025) “Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ”, Heuristic, 21(2), pp. 173-186. doi: 10.30996/heuristic.v21i2.12401.