Ponda, H., Fatma, N. and Azis, J. (2025) “Feasibility Study of Infrastructure Investment (Tail Dock) Using Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP) Methods”, Heuristic, 22(1), pp. 71 - 78. doi: 10.30996/heuristic.v22i1.131909.