[1]
F. Putri and I. Nugraha, “Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ”, Heuristic, vol. 21, no. 2, pp. 173-186, Jan. 2025.