Putri, F., and I. Nugraha. “Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ”. Heuristic, Vol. 21, no. 2, Jan. 2025, pp. 173-86, doi:10.30996/heuristic.v21i2.12401.