Putri, Firda, and Isna Nugraha. “Optimizing Project Duration and Cost of Support Ship through Time-Cost Trade-Off Analysis and Microsoft Project Application: A Case Study at PT XYZ”. Heuristic 21, no. 2 (January 13, 2025): 173-186. Accessed April 19, 2025. https://jurnal.untag-sby.ac.id/index.php/HEURISTIC/article/view/12401.