PENGARUH TOTAL QUALITY CONTROL DAN JUST IN TIME TERHADAP PENINGKATAN KUALITAS PRODUK DAN EFISIENSI BIAYA
DOI:
https://doi.org/10.30996/jea17.v6i2.5962Keywords:
Total Quality Control, Just In Time, Product Quality Improvement and Cost EfficiencyAbstract
The research entitled Effect of Total Quality Control and Just In Time on improving product quality and cost efficiency aims to analyze the effect of Total Quality Control (TQC) and Just In Time (JIT) on improving product quality and cost efficiency. This research was conducted at one of the manufacturing companies in Surabaya, namely UD. Sukri Dana Abadi. This study used descriptive qualitative method. The type of data used in this study is the type of primary data where researchers obtain data through direct data collection efforts. Methods of data collection is done by conducting interviews and observations on the object under study. The results of this study indicate that Total Quality Control (TQC) has an effect on improving product quality and cost efficiency, where the quality of the resulting product is in accordance with the specifications and Standard Operational Prosedur (SOP). While Just In Time (JIT) shows a significant effect on improving product quality and cost efficiency. The storage fee before Just In Time is Rp. 7,463,577 while the storage cost after Just In Time is Rp. 3,732,788 then there is a difference of Rp. 3,731,788 which means Just In Time can reduce costs by Rp. 3,731,788.Downloads
References
Adianto, A., & Miharja, R. (2019). USULAN PENJADWALAN PRODUKSI BENANG MENGGUNAKAN METODE NEH DAN METODE ALGORITMA JOHNSON UNTUK MEMINIMASI WAKTU PRODUKSI DI PT. LAKSANA KURNIA MANDIRI SEJATI. Jurnal Ilmiah Teknik Industri, 6(3).
Endang, R. (2018). ANALISIS PENJADWALAN PRODUKSI MENGGUNAKAN METODE EARLIEST DUE DATE (EDD) PADA CV. ROOKIE INDUSTRIES BANDUNG. PERPUSTAKAAN.
Fudhla, A. F., Juniani, A. I., & Windyaningrum, L. (2017). Pengembangan Metode Activity Based Time Study untuk Sistem Produksi Engineering To Order (ETO) Dengan Tipe Aliran Job Shop.
Khannan, M. S. A. (2013). Penjadwalan Job Shop Manufacturing untuk Meminimalkan Makespan.
Lesmana, N. I. (2016). Penjadwalan Produksi Untuk Meminimalkan Waktu Produksi Dengan Menggunakan Metode Branch And Bound. Jurnal Teknik Industri, 17(1), 42–50.
Rosyad, A. S. (2017). Penjadwalan Produksi dengan Menggunakan Algoritma Simulated Annealing untuk Menurunkan Makespan pada Penjadwalan Produksi (Studi Kasus: PT. Malindo Intitama Raya). University of Muhammadiyah Malang.
Sugiyono, P. D. (2017). Metode Penelitian Bisnis: Pendekatan Kuantitatif, Kualitatif, Kombinasi, dan R&D. Penerbit CV. Alfabeta: Bandung.
Tagawa, S. (1996). A new concept of job shop scheduling system—hierarchical decision model. International Journal of Production Economics, 44(1–2), 17–26.
Downloads
Published
Issue
Section
License
Authors whose manuscript is published will approve the following provisions:
- The right to publication of all journal material published on the JEA17: Jurnal Ekonomi Akuntansi website is held by the editorial board with the author's knowledge (moral rights remain the property of the author).
- The formal legal provisions for access to digital articles of this electronic journal are subject to the terms of the Creative Commons Attribution-ShareAlike (CC BY-SA) license, which means JEA17: Jurnal Ekonomi Akuntansi reserves the right to store, modify the format, administer in the database, maintain and publish articles without requesting permission from the Author as long as it keeps the Author's name as the owner of Copyright.
- Printed and electronically published manuscripts are open access for educational, research, and library purposes. In addition to these objectives, the editorial board shall not be liable for violations of copyright law.





