ANALISIS PEMBANGUNAN SALURAN IRIGASI MENGGUNAKAN BETON PRACETAK

  • Dutha Hepy Zulkarnaen Universitas 17 Agustus 1945 Surabaya
  • Wateno Oetomo Universitas 17 Agustus 1945 Surabaya
  • Herry Widhiarto

Abstract

Irrigation area of the Banjaranyar reservoir, the current condition of the irrigation network
requires proper maintenance of the irrigation network. Based on these problems, it is necessary to
study the maintenance of the irrigation canal of the Banjaranyar reservoir. Therefore, a lot of
research is needed on how to realize the building with an effective cost and implementation time.
In the sense that with minimal funds, it can produce maximum maintenance work with the right
allocation.
The analysis is carried out using the critical path method, so it is expected that the time and cost
allocations can be calculated with certainty in accordance with the availability of work package
time allocations in one budget year with smaller costs during the construction service life.
The purpose of this thesis is to analyze the cost of irrigation construction using precast concrete
using the critical path method and to analyze the timing of irrigation development using precast
concrete using the critical path method.
The result of this research is the acceleration from 90 calendar days to 60 calendar days can be
done by rescheduling by eliminating the lag time between work activities.

Downloads

Download data is not yet available.

References

Badri Sofwan. 1983. Dasar-dasar Network Planning. Jakarta : Bina Aksara. Barrie Donal S. 1993. Manajemen Konstruksi Profesional, Edisi ke-2. Jakarta : Erlangga.
Dannyanti Eka. 2010. Optimalisasi Pelaksanaan Proyek dengan Metode PERT dan CPM. Semarang : Penerbit Universitas Diponegoro.
Ervianto Wulfram I. 2002. Manajemen Proyek Konstruksi, Edisi Revisi. Yogyakarta : Penerbit Andi.
Feredika Ariany. 2010. Analisis Percepatan Pelaksanaan dengan Menambaha Jam Kerja Optimum pada Proyek Konstruksi. Denpasar : Penerbit Universitas Udayana.
Griffin Ricky. 2004. Manajemen. Jakarta : Erlangga.
Herwansyah Diyan. 2007. Estimasi Anggaran Biaya Konstruksi dan Rencana Penjadwalan Tahap Desain pada Pembangunan Kampus BSI Margonda. Depok : Penerbit Fakultas Teknik Sipil.
Heryanto Imam dan Totok Triwibowo. 2009. Manajemen Proyek Berbasis Teknologi Informasi. Bandung : Penerbit Informatika.
Ichsan, dkk. 2007. Manajemen Proyek. Jakarta : Penerbit Project Management.
Kerzner Harold. 2001. Project Management, a System Approach to Planning, Schedulling and Controlling. Canada.
--------2009. Project Management, a System Approach to Planning. Canada : CitaBook Store.
Koolma A dan C.J.M. van de Schoot. 1988. Manajemen Proyek. Jakarta : Penerbit Universitas Indonesia.
Laras Panji. 2007. Metode Pelaksanaan dan Pengendalian Waktu pada Pekerjaan Struktur Under Pass. Bogor : Penerbit Universitas Pakuan.
Mingus Nancy. 2002. Project Management Dalam 24 Jam. Jakarta : Prenada Media. Mulyono Sri. 2004. Riset Operasi. Jakarta : Lembaga Penerbit Fakultas Ekonomi Universitas Indonesia.
Muhammad Fauzan, Optimalisasi rencana anggaran biaya dan waktu pelaksanaan dengan preseden diagram method (pdm) pada proyek pembangunan SDN 3 Dewantara, Teras Jurnal, Jurusan Teknik Sipil Fakultas Teknik Universitas Malikussaleh, Jl. Cot Tgk. Nie, Reuleut, Aceh Utara, Indonesia Volume 6 Nomor 2, September 2016.
Novianty Inge Windya. 1998. Optimasi Waktu dan Biaya pada Percepatan Waktu Pelaksanaan Proyek. Jakarta : Penerbit Universitas Trisakti.
Peter Stelth dan Guy Le Roy, Projects’ Analysis through CPM (Critical Path Method), School of Doctoral Studies (European Union) Journal - July, 2009
R.J. WILLIS, Critical path analysis and resource constrained project scheduling-Theory and practice, European Journal of Operational Research 21 (1985) 149-155North-Holland.
Robbins Stephen P. dan Mary Coulter. 2005. Manajemen, Edisi Kedelapan. New Jersey : Indeks.
Rovel Brando Polii dan D. R. O. Walangitan, Jermias Tjakra SISTEM PENGENDALIAN WAKTU DENGAN CRITICAL PATH METHOD (CPM) PADA PROYEK KONSTRUKSI (Studi Kasus : Menara Alfa Omega Tomohon), Jurnal Sipil Statik Vol.5 No.6 Agustus 2017 (363-371) ISSN: 2337-6732)
Santosa Budi. 2003. Manajemen Proyek. Surabaya : Prima Printing.
Santosa Purbayu Budi dan Ashari. 2005. Analisis Statistik dengan Microsoft Excel dan SPSS. Yogyakarta : Andi.
Soeharto Imam. 1990. Manajeman Proyek Industri (persiapan, pelaksanaan, pengelolaan). Jakarta : Erlangga.
Soeharto Imam 1995. Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta : Erlangga.
Subagyo Pangestu, dkk. 1999. Dasar-dasar Operations Research. Yogyakarta : BPFE.
Sudarsana Dewa Ketut. 2008. Pengendalian Biaya dan Jadual Terpadu pada Proyek Konstruksi. Denpasar: Penerbit Universitas Udayana.
Sutanto, METHOD (CPM) DALAM PENJADWALAN KEGIATAN PEMBANGUNAN PERUMAHAN, GEMA TEKNOLOGI Vol. 17 No. 4 Periode Oktober 2013 - April 2014.
Sutopo Hadi. 2007. Manajemen Proyek Multimedia. Jakarta : Diktat Program Studi Teknik Informatika D3.
Syafriandi. 2003. Aplikasi Microsoft Project 2000 Untuk Penjadwalan Kerja dalam Proyek Teknik Sipil. Jakarta : Dinastindo.
Published
2023-05-12
Section
Articles