MODEL INTEGRASI 2 STAGE DATA ENVELOPMENT ANALYSIS-MONTE CARLO UNTUK PEMILIHAN PARTNER SUBKONTRAK
Abstract
With cheaper consideration, product subcontracting often becomes an option. So far the selection of subcontractors is based solely on the price of the cheapest contract offered. Apparently not enough, there are still some input and output variables that must be considered. So far, the existing methods still have some weaknesses. The classic DEA model often fails to work effectively because it is very sensitive to statistical changes. Meanwhile the AHP and DEMATEL methods are not appropriate when the unequal monthly risk frequency is encountered. So we need to develop new method, that is integration 2 Stage Data Envelopment Analysis (DEA) -Monte Carlo. Using VBA-excel based simulation assistance, it can be concluded that the most appropriate subcontract partner for UV process is DMU 1A (Central Coating) while subcontract partner for embossed process is DMU 1B (Super Indah Langgeng) and the most appropriate subcontracted laminating process partner is DMU 1C is (Central Coating), each having the best productivity with low risk level. Key Word: Subcontract Selection, Eficiency, Productivity, 2 Stage DEA-Monte CarloDownloads
References
Brain, S. 2017. Job Overseas Outsourcing Statistics. http://www. statisticbrain.com.
Cooper, W. W. S. L. M. &. T. K., 2002. Data Envelopment Analysis:A Comprehensive
Text with Models, Applications, References and DEA-Solver Software. United
States of America: Kluwer Academic Publishers .
Jilani, Z. 2011. Chart: Top ‘U.S.’ Corporations Outsourced More Than 2.4 Million
American Jobs Over The Last Decade. www.thinkprogress.org
Nasution, A. H. d. B. I., 2007. Simulasi Bisnis. Yogyakarta: Andi Offset.
Olson, D. L. W. D. 2011. Risk Management Models For Supply Chain: A Scenario
Analysis Of Outsourcing To China. Supply Chain Management: An International
Journal, 16(6):401–408.
Olson, D. L. W. D., 2008. Supply Chain Risk, Simulation, and Vendor Selection.
International Journal Production Economics, 114: 646-655.
Maulin Masyito Putri, Model Integrasi 2 Stage Data Envelopment . . .
Olson, D. L. W. D., 2011. Risk Management Models For Supply Chain: A Scenario
Analysis Of Outsourcing To China. Supply Chain Management: An International
Journal, 16(6): 401–408.
Pujawan, I. N. and. E. M., 2010. Supply Chain Management. Edisi Kedua. Surabaya:
Penerbit Guna Widya.
Suwondo, C., 2003. Subkontrak Implementasi di Indonesia. Jakarta: PT Gramedia.
Yang, F. W. D. L. B. G. A. W. D. D. 2009. Supply Chain Dea: Production Possibility Set
And Performance Evaluation Model. Ann Oper Res 2011: 185.
Authors who publish with Heuristic agree to the following terms:
- Authors transfer the copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access)