Workload Analysis to Determine Optimal Labor Need in the Production Division at UD. XYZ
DOI:
https://doi.org/10.30996/heuristic.v23i2.133609Keywords:
Labor Needs; Production Efficiency; Standard Time; Stopwatch Time Study; Workload AnalysisAbstract
The increasingly competitive manufacturing industry requires companies to manage the production process efficiently and optimally. This research aims to analyze workload and determine the optimal workforce needs at UD. XYZ, a wheeldop manufacturing company located in Sidoarjo, East Java. The main problem faced by the company is the repeated failure to achieve the 98% production target during the period from July 2025 to March 2026, with the realization only reaching 91%-95%. Data were collected through stopwatch time studies involving 20 worker across six worlstatoions. The observed time were proceses to determine cycle time, normal time using the Westinghouse Rating Factor method, and standard time by incorporating allowances. Furthermore, Workload Analysis (WLA) was applied to evaluate workforce adequacy based on actual workloads. The results indicate that the rolling workstation is overloaded, with a WLA value exceeding 1.0, while the other workstations fall within the normal to underloaded categories. To address this imbalance, two alternatives were evaluated: adding permanent workers and implementing an overtime system. Cost analysis revealed that the overtime system is more economical, with a monthly cost difference of IDR 9,360,000. The main contribution of this study lies in integrating workload assessment with a comparative cost analysis to identify a practical workforce adjustment strategy for wheel trim manufacturing. These findings provide an evidence-based recommendation for addressing workload imbalances, improving workforce utilization, and supporting the achievement of production targets.
Downloads
References
S. Asarela and R. P. Sari, “Analisis Pengukuran Kerja Menentukan Waktu Baku Menggunakan Metode Jam Henti Terhadap Operator Persiapan Komponen ( Studi Kasus : PT XYZ ),” vol. VIII, no. 3, pp. 6479–6486, 2023.
V. Kenanga, N. A. N. Wangi, E. Bahiroh, and A. L. I. Imron, “Dampak Kesehatan Dan Keselamatan Kerja , Beban Kerja ,” vol. 7, no. 1, pp. 40–50, 2020.
S. A. Pasaribu, R. Whyuni, and A. T. Nugraha, “PENENTUAN WAKTU BAKU PADA PROSES PEMBUATAN PAVING BLOCK BERJENIS BATA (STUDI KASUS: CV. KARYA MANDIRI SEJAHTERA BANDAR LAMPUNG) Sondang Asinauli Pasaribu, Rizqi Wahyudi, Andhyka Tyaz Nugraha 2,” vol. 19, no. 2, pp. 12–20, 2018.
Y. A. Nurdiansyah and H. F. Satoto, “Optimasi Waktu Standar Kerja Menggunakan Metode Stopwatch,” vol. 5, no. 1, 2023.
A. Y. Pradana and F. Pulansari, “ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT . XYZ,” vol. 02, no. 01, pp. 13–24, 2021.
D. A. M. Andris and H. F. Satoto, “TENAGA KERJA PADA PRODUKSI CAGE WHEEL DENGAN METODE STOPWATCH TIME STUDY ( STUDI KASUS : CV . LANCAR JAYA ),” pp. 371–380, 2023.
M. Rahayu, “Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja,” vol. 7, no. 2, 2020.
R. A. Firnanda and H. Murnawan, “PENENTUAN JUMLAH TENAGA KERJA PADA UD SURYA SEJATI DENGAN METODE WORKLOAD ANALYSIS ( WLA ),” pp. 1384–1399, 2023.
D. S. Suci, E. Indriastiningsih, and A. Widiyanto, “Penerapan Metode Workload Analysis Dalam Penentuan Tenaga Kerja,” vol. 9, no. 1, pp. 1–8, 2026.
V. No, A. Maulana, and B. Wibowo, “JOURNAL OF APPLIED MECHANICAL ENGINEERING AND RENEWABLE ENERGY ( JAMERE ) Analisis Jumlah Tenaga Kerja Optimal Dengan Metode Work Load Analysis ( WLA ) di PT . RSI,” vol. 1, no. 1, pp. 1–6, 2021.
W. Analysis and P. Kerja, “Analisis Beban Kerja Dengan Metode Workload Analysis ( WLA ) Dalam Menentukan Jumlah Tenaga Kerja Optimal Di PT INDOJT,” vol. 19, no. 2, pp. 247–256, 2020, doi: 10.20961/performa.19.2.46467.
A. V. Putra and H. F. Satoto, “Analisa Beban Kerja dan Studi Waktu Kerja Guna Optimalisasi Proses Produksi,” vol. 12, no. 1, pp. 169–175, 2025.
D. Diniaty and I. Ariska, “Penentuan Jumlah Tenaga Kerja Berdasarkan Waktu Standar Dengan Metode Work Sampling Di Stasiun Repair Overhoul Gearbox ( Studi Kasus : PT . IMECO Inter Sarana ),” vol. 3, no. 1, pp. 1–6, 2017.
N. R. Athirah and H. F. Satoto, “ANALISIS PENENTUAN JUMLAH TENAGA KERJA,” pp. 171–179, 2023.
M. P. Putri et al., “Pengukuran beban kerja dengan metode full time equivalent dan penentuan jumlah tenaga kerja efektif menggunakan workload analysis,” vol. 04, no. 01, 2021.
Downloads
Published
How to Cite
Issue
Section
License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with Heuristic agree to the following terms:
- Authors transfer the copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access)