Abstract

Indonesia holds among the world's largest bauxite reserves, yet for decades most of this resource was exported as low value-added raw ore, generating limited economic benefit for the country. The government's mineral downstreaming policy, culminating in a nationwide ban on raw bauxite exports since June 2023, has created an urgent need for domestic alumina refining capacity, while the very large capital requirements and volatile raw-material prices involved make such investment decisions highly uncertain. This study assesses the investment feasibility of constructing an alumina refinery plant with a production capacity of 2 million tons per year in the Mempawah Industrial Area, West Kalimantan, Indonesia, driven by this policy context and by growing global demand for aluminum-based products. A quantitative approach was used, comprising demand forecasting with the Moving Average method (m = 3), estimation of capital expenditure (CAPEX) and operating expenditure (OPEX), and evaluation of financial feasibility through Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP), followed by a scenario-based sensitivity analysis on bauxite and caustic soda (NaOH) prices. The demand forecast indicates a stable long-term national alumina consumption of approximately 5.17 million tons per year, supporting the plant's 2-million-ton-per-year capacity. Results show a required investment of approximately IDR 22.44 trillion, dominated by production machinery and equipment (44%). The financial evaluation yields a positive NPV of approximately IDR 3.49 trillion, an IRR of 12.93% (above the 10% Minimum Attractive Rate of Return), and a payback period of 7 years and 306 days, indicating that the project is financially feasible. Sensitivity analysis reveals that bauxite price is the most influential variable, followed by caustic soda price; the project remains feasible as long as IRR stays above the MARR and NPV remains positive. Compared with earlier alumina/SGA plant studies, which addressed either technical process design or financial feasibility in isolation, this study integrates both dimensions with a raw-material price-sensitivity analysis, offering a more complete decision-making basis for large-scale alumina refinery investment in Indonesia.

Downloads

Download data is not yet available.

References

H. Purnomo and R. A. E. Wijaya, “Pemetaan Sebaran Kadar Al2O3 dan RSiO2 Pada Endapan Laterit Bauksit Menggunakan Pendekatan Metode Interpolasi Ordinary Kriging Dan Inverse Distance Weighting,” Angkasa: Jurnal Ilmiah Bidang Teknologi, vol. 14, no. 1, May 2022, doi: 10.28989/angkasa.v14i1.1227.

J. A. Shinta and U. Wikarya, “The Impact Analysis of Bauxite Downstreaming on the Indonesian Economy: Case Study in PT Bintan Alumina Indonesia,” Journal La Sociale, vol. 5, no. 2, pp. 383–397, Mar. 2024, doi: 10.37899/journal-la-sociale.v5i2.1080.

D. Rianto, D. S. Oetomo, and R. F. Ramdhani, “Analisis Kelayakan Pembangunan Proyek Smelter Grade Alumina (SGA) pada PT. X,” SAINTEKS: JURNAL SAIN DAN TEKNIK, vol. 5, pp. 246–258, 2023, doi: http://dx.doi.org/10.37577/sainteks.v%vi%i.598.

M. R. A. Putranta, S. P. F. H. Purba, and R. F. Mulyawan, “Pengaruh Larangan Ekspor Nikel dan Bauksit Terhadap Lingkungan ,” Jurnal Ilmiah Ekonomi Dan Manajemen, vol. 3, p. 94, doi: hps://doi.org/10.61722/jiem.v3i2.3788.

D. S. Oetomo, “Studi Kelayakan Pembangunan Pabrik Baterai Sepeda Motor Listrik di Kawasan Jiipe, Kabupaten Gresik, Jawa Timur Oleh PT ‘X,’” Jurnal Teknik Industri Terintegrasi, vol. 6, no. 3, pp. 781–789, Jul. 2023, doi: 10.31004/jutin.v6i3.17052.

M. Irfan Syahroni, D. STIT Al-Aziziyah, J. I. TGH Umar Abdul Aziz kapek Gunung Sari Lombok Barat, and kode pos, “PROSEDUR PENELITIAN KUANTITATIF,” Jurnal Al-Musthafa STIT Al-Aziziyah Lombok Barat, vol. 43, no. 3, 2022.

M. Giatman, Ekonomi Teknik. Jakarta: Raja Grafindo Persada, 2006.

Z. H. Siregar, “EKONOMI TEKNIK.” [Online]. Available: https://www.researchgate.net/publication/360269062

R. P. Wahyuningsih, “Prarancangan Pabrik Aluminium Oksida Dari Bauksit Dan Natrium Hidroksida Dengan Kapasitas 450.000 Ton/Tahun,” 2026.

K. C. Wanta et al., “Analisis kelayakan finansial dan non finansial untuk pendirian pabrik pakan ikan berbasis maggot,” Jurnal Rekayasa Proses, vol. 17, no. 2, pp. 225–235, Dec. 2023, doi: 10.22146/jrekpros.80087.

Heni Martanila and G. M. K. Arisena, “Feasibility Study Of Financial Development Of Nilam,” Jurnal Hexagro, vol. 7, no. 2, pp. 162–174, Aug. 2023, doi: 10.36423/hexagro.v7i2.1263.

F. Maulana Akbar, M. Aulia Fadhil, J. A. Yani Km, K. ULM Banjarbaru, and K. Selatan, “Prarancangan Pabrik Kimia Alumina Dari Bauksit Dan Natrium Hidroksida Dengan Proses Bayer Kapasitas Produksi 440.000 Ton/Tahun,” 2022.

M. F. Dharmawan and M. N. F. Harahap, “Prarancangan Pabrik Smelter Grade Alumina Refinery Dengan Bahan Baku Bauksit Dan Natrium Hidroksida Melalui Proses Bayer Dengan Kapasitas 1.000.000 Ton/Tahun,” Jun. 2025. [Online]. Available: https://repositori.usu.ac.id/handle/123456789/106127

B. E. Raahauge and F. S. Williams, Smelter Grade Alumina from Bauxite History, Best Practices, and Future Challenges, vol. 320. Springer Nature Switzerland, 2022. doi: https://doi.org/10.1007/978-3-030-88586-1.

A. Nauvally, R. Nuryadi, and M. Jufriyanto, “Analisis Peramalan Kebutuhan Bahan Baku BA 1 Menggunakan Metode Moving Average Dan Single Eksponential Smoothing,” Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), vol. 5, no. 2, pp. 831–839, 2026.

W. Nurlela et al., “Analisis Metode Moving Average, Exponential Smoothing, dan Arima dalam Peramalan Permintaan untuk Pengendalian Stok Floor Rear (Studi Kasus : PT. SAI),” Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), vol. 4, no. 3, pp. 1066–1075, 2025.

S. Bahri, D. S. Oetomo, and A. Hermawan, “Financial Feasibility Analysis of Copper Cathode Factory at PT. X in Central Kalimantan,” Sainteks: Jurnal Sain dan Teknik, vol. 06, no. 02, 2024, doi: 10.37577/sainteks.v6i2.778.

Downloads

Published

2026-10-01

How to Cite

Sugiantoro, W., Oetomo, D. S., & Hermawan, A. (2026). Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan. Heuristic, 23(2), 213–224. https://doi.org/10.30996/heuristic.v23i2.133822