PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA OHSAS 18001:2007 PADA PELAKSANAAN PROYEK PEMBANGUNAN FLY OVER PASAR KEMBANG SURABAYA
Abstract
The purpose of this study was (1) Know the process of applying for K3 management system development projects Fly Over Flower Market Surabaya, (2) Getting the elements associated with OHSAS 18001:2007. From the analysis it was found that (1) monitoring and evaluation process of the construction SMK3 Fly Over Flower Market, is only intended to measure the level of implementation of SMK3 in fulfilling the terms of the security, safety and health at the site of construction activities carried out to the service user (PIU ), KDP, and the service provider. By adjusting the results of the monitoring and evaluation SMK3 into the element K3 OHSAS 18001:2007 Management, implementation SMK3 more profitable. The advantage is that its elements can be used to specify the K3 policy, planning, program objectives and K3. (2) Through Gap Analysis calculations using the Radar Chart, obtained K3 Management OHSAS 18001:2007 elements associated with the results of the monitoring and evaluation is an element SMK3 K3 Policy (clause 4.2) with a value of 94.00%, Planning (clause 4.3) with values 96.30%, Implementation and Operation (clause 4.4) with a value of 96.30%, Inspection and Repair (clause 4.5) with a value of 93.34% and Management Review (clause 4.6) with a value of 93.33%. It shows very well and in accordance with the implementation of the management system K3 is done through monitoring and evaluation.
Kata kunci : fly over, gap analysis, OHSAS
Downloads
References
Balai Besar Pelaksanaan Jalan Nasional V, 2010. Fly Over Pasar Kembang Surabaya. Surabaya.
Kangari, R. 1995. Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management. ASCE.
Kementrian Pekerjaan Umum, 2011. Kebijakan Pemerintah Tentang K3. Permen PU
No: 09/PRT/M/2008, 1 Juli 2008, Jakarta
Kerzner, H. 2001. Project Management. Seventh Edition. John Wiley & Sons, Inc. New York.
Miftah, Aulia, 2012. Analisis Implementasi OHSAS 18001:2007 Pada PT. X di Bandung, Jawa Barat (Studi Kasus Bagian Environment & Safety Dalam Penanganan Terhadap Kontraktor). Program Sarjana Alih Jenis Manajemen Fakultas Ekonomi Dan Manajemen, Institut Pertanian Bogor. Bogor.
Pemerintah Republik Indonesia (1997). Dasar- dasar K3 Konstruksi. Menteri Tenaga Kerja Permen Nomor : PER – 05/MEN/1999, Jakarta
Rahayu, P.H. 2001. Asuransi Contractor’s All Risk sebagai Alternatif Pengalihan Risiko Proyek Dalam Industri Konstruksi Indonesia. Seminar Nasional
Ramli, Soehatman, 2010. Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS 18001. PT. Dian Rakyat, Jakarta
Rohmansyah, 2009. Studi Implementasi Ohsas 18001:1999 Pada Galangan Kapal Berskala Menengah Di Surabaya. Jurusan Teknik Perkapalan, Institut Teknologi Sepuluh Nopember Surabaya, Surabaya.
Singarimbun, Masri, 1987. Metode Penelitian Survei, LP3ES, Jakarta.
Supranto, J, 1998. Teknik Sampling :Untuk Survei dan Eksperimen, PT. Rineka Cipta, Jakarta.
Yulianti, Indah, 2006. Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (Smk3) Dengan Standar Ohsas 18001 Di PT. Bina Guna Kimia (An Fmc Joint Venture Company) Ungaran. Jurusan Teknik Sipil, Universitas Diponegoro, Semarang.
www.balai5.net/berita/237.html
www/irqa.co.uk, 2005. Product and Service / Health / OHSAS 18001
www.google-map.com
http://isjd.pdii.lipi.go.id/admin/jurnal/91085770.pdf
http://library.binus.ac.id/eColls/eThesis/Bab2/2007-2-00491-SI-Bab%202.pdf
Authors who publish with Heuristic agree to the following terms:
- Authors transfer the copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access)