PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA OHSAS 18001:2007 PADA PELAKSANAAN PROYEK PEMBANGUNAN FLY OVER PASAR KEMBANG SURABAYA

  • I Nyoman Lokajaya Teknik Industri Untag Surabaya

Abstract

The purpose of this study was (1) Know the process of applying for K3 management system development projects Fly Over Flower Market Surabaya, (2) Getting the elements associated with OHSAS 18001:2007. From the analysis it was found that (1) monitoring and evaluation process of the construction SMK3 Fly Over Flower Market, is only intended to measure the level of implementation of SMK3 in fulfilling the terms of the security, safety and health at the site of construction activities carried out to the service user (PIU ), KDP, and the service provider. By adjusting the results of the monitoring and evaluation SMK3 into the element K3 OHSAS 18001:2007 Management, implementation SMK3 more profitable. The advantage is that its elements can be used to specify the K3 policy, planning, program objectives and K3. (2) Through Gap Analysis calculations using the Radar Chart, obtained K3 Management OHSAS 18001:2007 elements associated with the results of the monitoring and evaluation is an element SMK3 K3 Policy (clause 4.2) with a value of 94.00%, Planning (clause 4.3) with values 96.30%, Implementation and Operation (clause 4.4) with a value of 96.30%, Inspection and Repair (clause 4.5) with a value of 93.34% and Management Review (clause 4.6) with a value of 93.33%. It shows very well and in accordance with the implementation of the management system K3 is done through monitoring and evaluation.
Kata kunci : fly over, gap analysis, OHSAS

Downloads

Download data is not yet available.

References

Balai Besar Pelaksanaan Jalan Nasional V, 2010. Fly Over Pasar Kembang Surabaya. Surabaya.

Kangari, R. 1995. Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management. ASCE.

Kementrian Pekerjaan Umum, 2011. Kebijakan Pemerintah Tentang K3. Permen PU

No: 09/PRT/M/2008, 1 Juli 2008, Jakarta

Kerzner, H. 2001. Project Management. Seventh Edition. John Wiley & Sons, Inc. New York.

Miftah, Aulia, 2012. Analisis Implementasi OHSAS 18001:2007 Pada PT. X di Bandung, Jawa Barat (Studi Kasus Bagian Environment & Safety Dalam Penanganan Terhadap Kontraktor). Program Sarjana Alih Jenis Manajemen Fakultas Ekonomi Dan Manajemen, Institut Pertanian Bogor. Bogor.

Pemerintah Republik Indonesia (1997). Dasar- dasar K3 Konstruksi. Menteri Tenaga Kerja Permen Nomor : PER – 05/MEN/1999, Jakarta

Rahayu, P.H. 2001. Asuransi Contractor’s All Risk sebagai Alternatif Pengalihan Risiko Proyek Dalam Industri Konstruksi Indonesia. Seminar Nasional

Ramli, Soehatman, 2010. Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS 18001. PT. Dian Rakyat, Jakarta

Rohmansyah, 2009. Studi Implementasi Ohsas 18001:1999 Pada Galangan Kapal Berskala Menengah Di Surabaya. Jurusan Teknik Perkapalan, Institut Teknologi Sepuluh Nopember Surabaya, Surabaya.

Singarimbun, Masri, 1987. Metode Penelitian Survei, LP3ES, Jakarta.

Supranto, J, 1998. Teknik Sampling :Untuk Survei dan Eksperimen, PT. Rineka Cipta, Jakarta.

Yulianti, Indah, 2006. Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (Smk3) Dengan Standar Ohsas 18001 Di PT. Bina Guna Kimia (An Fmc Joint Venture Company) Ungaran. Jurusan Teknik Sipil, Universitas Diponegoro, Semarang.

www.balai5.net/berita/237.html

www/irqa.co.uk, 2005. Product and Service / Health / OHSAS 18001

www.google-map.com

http://isjd.pdii.lipi.go.id/admin/jurnal/91085770.pdf

http://library.binus.ac.id/eColls/eThesis/Bab2/2007-2-00491-SI-Bab%202.pdf

Published
2016-03-23
How to Cite
Lokajaya, I. N. (2016). PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA OHSAS 18001:2007 PADA PELAKSANAAN PROYEK PEMBANGUNAN FLY OVER PASAR KEMBANG SURABAYA. Heuristic, 12(01). https://doi.org/10.30996/he.v12i01.622
Section
Articles