Construction Safety Plan for High-Rise Building Construction Projects: Evaluation and Development

Authors

  • Fhirtania Ashril Indarta Universitas Jember
  • Jojok Widodo Soetjipto Universitas Jember
  • Anik Ratnaningsih Universitas Jember

DOI:

https://doi.org/10.30996/jspts.v6i2.132746

Keywords:

building, construction safety, HIRARC method

Abstract

Multi-story building construction projects have high complexity, involving many stakeholders with different skills and competencies. Therefore this project has a threat of failing to comply with security, safety, health, and sustainability (K4) standards. The government requires each project development stage to implement a Construction Safety Plan (RKK), but in reality, many construction activities still need to pay attention to this standard. Therefore it is necessary to evaluate RKK implementation in construction projects to minimize construction accidents. This study aims to determine the implementation of construction safety planning stages in building projects. This research will take a case study of the Regent's Office Building Project and the Regional Secretariat of Pasuruan Regency by conducting direct observations and interviews to evaluate the implementation of the RKK. The study results show that all components of the RKK are available, but the analysis of the potential hazards that may occur still needs to be improved. Job safety analysis as a construction safety plan has yet to be supported by proper hazard identification, risk assessment, and risk control following the implemented implementation method. This research can use the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method to solve this problem. The results of the HIRARC method assessment adjusted for the available variables according to the project implementation method yielded the following results. There were 26 variables with low risk, 57 with medium risk, and 21 with high risk. The hazard risk control strategy is prepared based on the OHS risk control hierarchy, namely engineering control, administrative management, and provision of PPE, because almost all activities in building work do not allow for eliminating risks using elimination and substitution.

Downloads

Download data is not yet available.

References

Alfatiyah, R. (2017). Analisis manajemen risiko keselamatan dan kesehatan kerja dengan menggunakan metode HIRARC pada pekerjaan seksi casting. Jurnal Mesin Teknologi (SINTEK Jurnal), 1–14.

Aprizaldi, M. F. A. (2022). Analisis risiko kecelakaan kerja dalam penggunaan tower crane dengan metode Analytical Hierarchy Process (AHP). INERSIA, 18(1), 83–93.

Dangga, P. O., dkk. (2020). Kajian faktor-faktor penyebab kecelakaan konstruksi. Student Journal GELAGAR, 1–8.

Harahap, I. M. P. F. (2022). Analisis risiko keselamatan dan kesehatan kerja (K3) melalui metode HIRADC dan metode JSA pada proyek lanjutan pembangunan Rumah Sakit Regional Langsa. Jurnal Teknik Sipil, 43–50.

Kholis Ardiansyah, S. I. H. H. P. M. (2022). Identifikasi faktor risiko keselamatan pada proyek konstruksi bangunan gedung di Indonesia dalam 10 tahun terakhir (2011–2021): Kajian literatur. Jurnal Teknologi dan Manajemen, 1–14.

Kurniawan, R. R. (2021). Identifikasi risiko menggunakan IBPRP dan JSA berdasarkan PERMEN PUPR No. 21 Tahun 2019 (studi kasus: pekerjaan struktur fondasi pada proyek pembangunan gedung layanan pembelajaran Fakultas ISIP Universitas Jenderal Soedirman Purwokerto). Jurnal Ilmiah Rekayasa Sipil, 18(1), 64–75.

Kurniawan, R. R. (2021). Identifikasi risiko menggunakan IBPRP dan JSA berdasarkan PERMEN PUPR No. 21 Tahun 2019. Jurnal Ilmiah Rekayasa Sipil, 1–12.

Marodiyah, I. S. (2020). Analisis risiko guna peningkatan kualitas proses pembangunan gedung bertingkat. Journal of Industrial Engineering and Management, 49–60.

Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. (2021). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi. Jakarta: Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia.

Prasetya, T. A. (2017). Identifikasi dan analisis risiko konstruksi yang mempengaruhi mutu dengan metode Failure Mode and Effect Analysis dan Fault Tree Analysis pada proyek pembangunan Apartemen Grand Sungkono Lagoon Surabaya. Jurnal Rekayasa Teknik Sipil REKATS, 1–12.

Presiden Republik Indonesia. (2021). Peraturan Pemerintah Republik Indonesia Nomor 16 Tahun 2021 tentang Peraturan Pelaksanaan Undang-Undang Nomor 28 Tahun 2002 tentang Bangunan Gedung. Jakarta: Pemerintah Republik Indonesia.

Rachmawati, F. (2022). Studi eksplorasi implementasi program keselamatan dan kesehatan kerja (K3) pada proyek konstruksi gedung bertingkat di Kota Surabaya. Jurnal Aplikasi Teknik Sipil, 125–130.

Ramadhan, F. (2017). Analisis kesehatan dan keselamatan kerja (K3) menggunakan metode Hazard Identification Risk Assessment and Risk Control (HIRARC). Seminar Nasional Riset Terapan 2017, 1–6.

Sari, K. P. (2022). Analisis risiko K3 pada proyek gedung RSUD Pasaman Barat dengan metode HIRARC. Jurnal Riset, 1–7.

Soetjipto, O. H. S. A. J. W. (2021). Asesmen pelaksanaan kesehatan dan keselamatan kerja pada proyek konstruksi dan sistem pengambilan keputusan menggunakan metode Fault Tree Analysis. Jurnal Bina Ketenagakerjaan, 2(2), 133–147.

Supriyadi, A., Nalhadi, A., & Rizaal, A. (2015). Identifikasi bahaya dan penilaian risiko K3 pada tindakan perawatan & perbaikan menggunakan metode HIRARC (Hazard Identification Risk Assessment and Risk Control) pada PT. X. Seminar Nasional Riset Terapan 2015 (SENASSET 2015), 281–286.

Triswandana, I. W. G. E., & Armaeni, N. K. (2020). Penilaian risiko K3 konstruksi dengan metode HIRARC. Jurnal Universitas Kadiri Riset Teknik Sipil, 1–13.

Zefri, D. A. W. S. R. (2022). Analisis risiko kegagalan Bendungan Paselloreng dengan metode pohon kejadian (Event Tree). Jurnal Teknik Sipil, 149–160.

-

Published

2025-10-30

Issue

Section

Articles