Cost and Time Analysis for the Planning of the Main Structure in the Kedung Lawang Irrigation Area, Banyuwangi Regency

Authors

  • Revin Iqbal Ramadhan Universitas 17 Agustus 1945 Surabaya
  • Laksono Djoko Nugroho Universitas 17 Agustus 1945 Surabaya
  • Esti Wulandari Universitas 17 Agustus 1945 Surabaya

Keywords:

Budget Plan, Cost and Time Analysis, Main Dam Structure, Value Engineering

Abstract

The construction of the main irrigation area structures requires precise technical planning as well as cost and time analysis to support the effectiveness and efficiency of the construction implementation. In the Kedung Lawang, Banyuwangi Regency, the construction of the main structures is planned to support the fulfillment of irrigation water needs in the downstream of the Irrigation Area. Therefore, an analysis of the main building planning is needed, considering technical aspects, selection of alternative materials, construction cost requirements, and the duration of the work implementation. This research aims to analyze the planning of the main building and examine the cost and time requirements based on the specified planning alternatives. The research method uses a quantitative descriptive approach by utilizing primary and secondary data. Cost analysis is conducted through the calculation of work volume, AHSP, and the preparation of the Bill of Quantity. Time analysis is carried out by considering productivity, the duration of each task, and the interrelationships between activities to develop the implementation schedule. The expected outcome of this research is to obtain the cost and duration requirements from the planning so that can be identified to be more efficient without reducing the function, quality, and technical requirements of the building. This research is expected to be as a consideration for planners and the government in determining economical and effective planning alternatives for the main structures of the Kedung Lawang Irrigation Area.

Downloads

Download data is not yet available.

References

Abidin, N., & Azizi, N. S. M. (2021). Soft cost elements: Exploring management components of project costs in green building projects. Environmental Impact Assessment Review, 87, 106545. https://doi.org/10.1016/j.eiar.2020.106545

Alshihri, S., Al‐gahtani, K., & Almohsen, A. (2022). Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia. Buildings, 12(7). https://doi.org/10.3390/buildings12070902

Antoro, A., Marleno, R., Tjendani, H. T., & Wulandari, E. (2026). JSpTS (Jurnal Spesialis Teknik Sipil) Analisis Biaya dan Waktu pada Proyek Perumahan Citraland dengan Metode Percepatan Trade Cost Trade Off (TCTO) (Studi Kasus Perumahan Citraland Utara, Cluster North West Lake, Surabaya).

Azeez, M., & Alsaffar, A. (2023). Construction Time-Cost Optimization Modeling Using Ant Colony Optimization. Journal of Engineering. https://doi.org/10.31026/j.eng.2014.01.09

Banihashemi, S., Khalilzadeh, M., Zavadskas, E., & Antuchevičienė, J. (2021). Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision-Making Method. Sustainability. https://doi.org/10.3390/su131910922

Bazarov, D., Markova, I., Norkulov, B., & Vokhidov, O. (2021). Hydraulic aspects of the layout of head structures during water intake from lowland rivers. IOP Conference Series: Materials Science and Engineering, 1015. https://doi.org/10.1088/1757-899x/1015/1/012041

Benin, D., & Snezhko, V. (2023). An innovative idea: Injection valves for irrigation ducts. Journal of Water and Land Development. https://doi.org/10.24425/jwld.2022.141575

Bettemir, Ö. H., & Yücel, T. (2023). Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling. Jordan Journal of Civil Engineering, 17(2), 293–309. https://doi.org/10.14525/JJCE.v17i2.10

Djendra Yuang Purbo, A., Wulandari, E., & Djoko Nugroho, L. (2025). Cost Analysis and Supervision of the Rehabilitation Construction of Several Reservoirs in the Brantas River Area, East Java (Vol. 4, Number 7). https://ajesh.ph/index.php/gp

Djoko Nugroho, L., Wulandari, E., Rumihin, F., & Subroto, T. (2026). Analisis Banjir Rancangan Metode HSS Laksono-Erub.

Farouk, A., Haron, A., Papadonikolaki, E., & Rahman, R. (2025). Holistic framework for soft costs in BIM-based construction projects. J. Inf. Technol. Constr., 30, 1659–1679. https://doi.org/10.36680/j.itcon.2025.068

Fernández-Valderrama, P., Ureña-Estrella, C., Moyano, J., & Bienvenido-Huertas, D. (2024). Cost and time risk factors in construction projects in the Dominican Republic. Frontiers in Built Environment. https://doi.org/10.3389/fbuil.2024.1307572

Firmansyah, D., & Halim, A. (2024). Perencanaan Bendung Pada Studi Kasus Daerah Irigasi Tapus Kabupaten Tanah Bumbu Kalimantan Selatan (Vol. 3, Number 2).

Gazaryan, A., & Glovatskii, O. (2021). Flow calculations in intake structures of hydropower plants. E3S Web of Conferences. https://doi.org/10.1051/e3sconf/202126403021

Yusnita, M., Wulandari, E., & Djoko Nugroho, L. (2025). Analysis of the Operational Value Needs of the Rapak Drainage System in Samarinda City (Vol. 4, Number 7). https://ajesh.ph/index.php/gp

Published

2026-11-05

Issue

Section

Articles