FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PERUBAHAN KONTRAK LUMP SUM PRICE MENJADI UNIT RICE

  • Abdulloh Abdulloh
  • Wateno Oetomo

Abstract

The work contract for the Surabaya-Gempol toll road relocation project Porong-Gempol
package 2 Porong-Kejapanan has been signed, namely in the form of a lump sum contract.
Due to a request from BPJT to change the design from 2 x 4 lanes to 2 x 6 lanes on the
Surabaya-Gempol toll road relocation project, Porong-Gempol 2 Porong-Kejapanan, the
contractor intends to propose a contract change from a lump sum to a unit price contract.
This study aims to determine and determine the factors that influence changes in the contract.
It turns out that by distributing questionnaires, it can be found that there are five main
variables, namely service users (X1), service providers (X2), third parties (X3), contracts (X4)
and environment (X5) that affect the final outcome of contract change (Y). By using factor
analysis and stepwise regression analysis aided by the SPSS program, it was found that only
the service user variable (X1) and the service provider variable (X2), which significantly
affected the contract change dependent variable (Y). And that influence is expressed by the
relationship Y = -1,171 + 0,268 X1 + 0,529 X2.
Keywords: lump sum contract, unit price contract,  factor analysis, multiple regression
analysis

Downloads

Download data is not yet available.

References

Antoniou, et al. (2012). Complexity in the Evaluation of Contract Types Employed for the

Construction of Highway Projects. Procedia-Social and Behavioral Sciences 74 (2013)

–458.

Elsevier Ltd. (2010). Kompleksitas dalam Evaluasi Jenis Kontrak yang Dipekerjakan untuk

Pembangunan Proyek Jalan Raya.

Bhakti, W. S. (2013). Penentuan Risiko Jenis Kontrak Pada Proyek Pembangunan Gedung

Di Lingkungan Total E & P Indonesie Dengan Metode Analytic Hierarchy Process

(AHP). Prosiding Seminar Nasional Manajemen Teknologi XVII, Program Studi MMTITS,

Surabaya.

Jordan, E. U., Puspanegara. (2008). Penerapan Kontrak Lump Sum dan Harga Satuan Pada

Pekerjaan Konstruksi di Kota Malang. Jurusan Teknik Sipil. Universitas Brawijaya

Malang 6(1):71-84.

Lee, I. R. (2014). Contractor’s Performance for Construction Project: A Review. Int. Journal

of Engineering Research and Applications. 4(4): 131-137. School of Engineering and

Advanced Technology, Universiti Technologi Malaysia, Kuala Lumpur, Malaysia.

Mulcahy’s. (2010). Risk Management, Tricks of the Trade for Project Managers. RMC

Publications, Inc. USA.

Oetomo. W. (2014). Manajemen Proyek dan Konstruksi Jilid 1. PT. Mediatama Saptakarya:

Jakarta.

Oetomo. W. (2014). Manajemen Proyek dan Konstruksi Jilid 2. PT. Mediatama Saptakarya:

Jakarta.

Puspitasari. (2016). Analisis Faktor Penyebab Terjadinya Perubahan Pada Kontrak Lump

Sum (Studi Kasus: Proyek Apartement And Soho Ciputra World).Fakultas Teknik

Universitas Brawijaya Malang

Anonim. (2004). Undang-Undang No. 38 Tahun 2004 tentang Jalan. Lembaran Negara RI

Tahun 2004, No. 132. Sekretariat Negara. Jakarta.

Anonim. (2017). Undang-Undang No. 2 Tahun 2017 tentang Jasa Konstruksi. Lembaran

Negara RI Tahun 2017, No. 11. Sekretariat Negara. Jakarta.

Soeharto. (2011). Manajemen Risiko Pada Proyek Konstruksi. Kanisius: Yogyakarta.

Sopian. (20014). Bolehkah Menggunakan Kontrak Harga Satuan Untuk Pengadaan

Pekerjaan Konstruksi. http://www.bppk.depkeu.go.id/bdk/pelembang/ attachment/.

Diakses 15 Januari 2018

Sopian. (20013). Perubahan Pekerjaan dalam Kontrak Pekerjaan Konstruksi.

http://www.bppk. depkeu.go.id/bdk/pelembang/attachment/. Dikses 15 Januari 2018.

Suputra, F. W. 2008. Analisis Perbandingan Risiko Biaya Antara kontrak Lumpsum Dengan

Kontrak Unit Price Menggunakan Metode Decision Tree. Jurnal Ilmiah Teknik Sipil

(2): 11-24.

Published
2019-11-12
Section
Articles