NALISIS MANEJEMEN RISIKO PEMBANGUNAN PROYEK JALAN LINTAS BAWAH TANAH BUNDERAN MAYJEN SUNGKONO SURABAYA
Abstract
The underground road construction project in the satellite roundabout area is a project witha risk level that is difficult to predict, so an in-depth risk management analysis is needed.
With the approach of the quality, cost and time specs, the dominant risk factors and changes
in costs and time will be sought due to the influence of these risk factors. By using 35
respondents, it turns out that the final results of the analysis show that from the aspect of
quality, the factor of planning changes, material lacking in quality, low productivity of work
tools becomes the dominant risk factor. While from the aspect of time, it turns out that the
failure factor of the team / project management, planning changes, and planning errors are
the dominant risk factors. Meanwhile, in terms of cost aspects of project management factors
and traffic safety, structural excavation, geotextile work, rigid pavement are the dominant
risk factors and from the natural aspect and planning aspects become the dominant source of
risk in terms of time and scope of structure work, general scope of work of in terms of cost. As
a result of these risk factors, it results in changes in costs for structural works of 75 million or
53%, while in public works amounting to 63 million or 11% with changes in time> 30 days.
Keywords: Risk analysis, underpass, risk factors, sources of risk
Downloads
References
Ahmed, A., Kayis, B., Amornsawadwatana, S. (2007). A Review of Techniques for Risk
Management in Projects, Benchmarking: An International Journal 14(1): 22–36.
Astiti Ni P. M., et al., (2017). Analisis Risiko Pelaksanaan Pembangunan Jalan Tol BenoaBandara-Nusa
Dua),
Jurnal
Teknik
Sipil.
(2):
.
Cahyono N. B., (2017), Analisis Manajemen Risiko Pada Proyek Pembangunan Jalan Tol
(Studi Kasus Proyek Pembangunan Jalan Tol Solo-Ngawi-Kertosono Ruas NgawiKertosono
Paket
, Jurnal
Teknik
Sipil
(1-15),
Universitas
Muhammadiyah
Surakarta.
Chapman, C.; Ward, S. (2003). Project Risk Management: Process, Techniques and Insights.
nd ed. Chichester: John Wiley and Sons. 319 p.
Chapman, C.; Ward, S. (2008). Developing and Implementing a Balanced Incentive and Risk
Sharing Contract, Construction Management and Economics 26(6): 659–669.
Chileshe N., (2010), Evaluation Of Risk Event Affecting Highway and Road Construction
Projects in Nigeria., DOI:10.13140/RG.2.1478.7045., University Of South Australia.
Dewi, C., (2013). Jurnal Teknik Analisis Risiko pada Proyek Underpass di Simpang Dewa
Kuta Bali., Jurnal Teknik. 2(2). Institut Teknologi 10 November.
Flanagan, R., Norman, G. (1993). Risk Management and Construction.Oxford: Blackwell
Publishing. 224 p.
Harahap, K., Bintang, C., Eka, P.Y., (2015). .Jurnal Analisis Risiko Pada Proyek
Pembangunan Jalan Tol Nusa Dua –- Ngurah Rai - Benoa, Bali, Fakultas
Teknik,Institut Teknologi Sepuluh Nopember (ITS).
Irianto., et al, (2017). Study On Risk Handling Strategy Of Road Construction Project In
Jayapura City, International Journal Of Scientific & Technology Research. 6(2). 08
august 2017.
Kerzner, H. (2004). Project Management, Baldwin-Wallace College Barea, Ohio
Mamduh M. H., (2009), Manajemen Risiko, Edisi Kedua, Unit Penerbit dan Percetakan,
Sekolah Tinggi Ilmu Manajemen, YKPN, Yogyakarta.
Maulydya, N., A,. (2017). Jurnal Analisis Risiko Pembangunan Kontruksi Jalan Tol Tahap
kontruksi dengan menggunakan metode Soft System Methodhology ( SSM ), Fakultas
Teknik, Universitas Lampung.
Miftahul H. & Soepriyono, (2011), Analisis Risiko penggunaan Dana APBN-P Pada
Pelaksanaan Proyek, Fakultas Teknik, Universitas Wijaya Kusuma Surabaya.
Miftahul H., (2009), Diktat Kuliah Professional Skill, Fakultas Teknik, Universitas Wijaya
Kusuma Surabaya.
Perera, B.A.K.S., Dhanasinghe I.; Rameezdeen, R. (2010). Risk Management in Road
Construction: the case of Sri Lanka, International Journal of Strategic Property
Management 13(2): 87–102
PMI. (2007). Construction Extension to the PMBOK® Guide. 3rd ed. Newtown Square:
Project Management Institute.
PMI. (2008). Guide to the Project Management Body of Knowledge (PMBOK® Guide). 4th
ed. Newtown Square: Project Management Institute.
Pertiwi, et,al., (2016). Manajemen Risiko Proyek Pembangunan Underpass Gatot Subroto
Denpasar, Jurnal akutansi ekonomi & bisnis, 4(1), Poli Teknik Negeri Bali.
Sandhyavitri, A., & Zulfiqar, M., (2014 ), Jurnal Analisis Risiko Pembangunan Jalan Tol Pada
Tahap Konstruksi, Fakultas Teknik, Universitas Riau. Jurnal teknik sipil. 10(1).
Santoso R., (2004). Tingkat Kepentingan dan Alokasi Risiko Pada Proyek Konstruksi, Thesis
S-2 Program Pasca Sarjana Magister Teknik Sipil – Manajemen Konstruksi, Universitas
Keristen Petra, Surabaya.
Mahmoud S. M., M. Mahmoud, T. A. Hassan., (2015), Analysis of Risk Factors for Highway
Construction Projects in Egypt, Journal Of Civil Engineering and Architecture 9(1): 526
-533.
Sugiyono, (2009). Statistik Untuk Penelitian. CV. Alfa Beta, Bandung.
Wibowo, (2010). Intisari Kuliah Manajemen Risiko. Program Magister Teknik Sipil,
Universitas Diponegoro, Semarang.
Wysocki, R. K. (2009). Effective Project Management: Traditional, Agile, Extreme.
Indianapolis: John Wiley and Sons. 792 p.
Zainuddin., (2014). Analisis Faktor Risiko Pada Proyek Kontruksi Jalan Raya. Jurnal Teknik
Sipil (1-12), Universitas Bojonegoro..
Zou, P.X.W.; Zhang, G.; Wang, J. (2007). Understanding the Key Risks in Construction
Projects in China, International Journal of Project Management 25(6): 601–614.