ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN KONTRUKSI DECK ON PILE DAN CAKAR AYAM MODIFIKASI (Study Kasus Pekerjaan Pondasi Rubber Tyred Gantry Crane Pads Pelabuhan Trisakti Banjarmasin)

  • Dwi Hartanto Universitas 17 Agustus 1945 Surabaya
  • Laksono Djoko Nugroho Universitas 17 Agustus 1945 Surabaya
  • Gede Sarya Universitas 17 Agustus 1945 Surabaya

Abstract

Trisakti II Port, located in the city of Banjarmasin, South Kalimantan, is one of the ports that uses RTG cranes. Constraints often arise due to the lack of support for the container/CY stockpiling field due to the elevation of the field under the highway. So that when it rains, the container yard is often flooded, causing physical damage to the container and its cargo. And the type of soil in the study area is soft soil, so planning for a good and efficient foundation structure is needed.

The purpose of writing this thesis is to determine the comparison of the costs and construction time used in the modified deck on pile and chicken claw structures. Determine which is more efficient between the deck on pile foundation structure and modified chicken claw. With the method of comparing the total cost of the budget and the time required for the implementation of construction. The results of this study are the results of the comparison of time and cost of deck on pile and modified chicken claw on the RTG Pad foundation work is the modified chicken claw foundation structure is 15% more efficient and 26% faster in execution time with a labor ratio that only differs 1 people per day. In terms of time and cost between deck on pile and modified chicken claw, it is found that the use of modified chicken claw structure is more efficient than deck on pile structure in this RTG Pad foundation work.

Downloads

Download data is not yet available.

References

AASHTO 2010. LRFD Bridge Design Spesifications.
“American Concrete Institut,” ACI 318-2008.
Badan Standardisasi Nasional. Satandar Pembebanan Untuk Jembatan, RSNI T-02-2005.

Badan Standardisasi Nasional. Perencanaan Struktur Beton Untuk Jembatan, RSNI T-12-2004.
Badan Standardisasi Nasional. Perencanaan Struktur Baja Untuk Jembatan, RSNI T-03-2005.
Badan Standardisasi Nasional. Perencanaan Jembatan Terhadap Beban Gempa, RSNI 2833:2010.
Badan Standardisasi Nasional. Perencanaan Jembatan Terhadap Beban Gempa, RSNI3 2833:201X
B.Arif 2011. Studi Pelaksaan Pekerjaan Tiang Pancag Piled Slab (Fly Over) Jembatan Martadipura Tenggarong Kalimantan Timur.
C. Hary Hardiyatmo Staf pengajar Jurusan Teknik Sipil dan Lingkungan Fakultas Teknik Universitas Gadjah Mada Yogyakarta, Jl. Grafika no.2 Yogyakarta. e-mail: harychristady@yahoo.com 2010. Metode hitungan Lendutan, Momen
Direktorat Jendral Bina Marga, Departemen Pekerjaan Umum 1992. Peraturan Perencanaan Teknik Jembatan, BMS 1992.
Gede Arya Wibawa, Made Sukrawa, I Nyoman Sutarja 2015. Efisiensi Perencanaan Jembatan Pile Slab dengan Bentang Bervariasi (Studi Kasus: Jalan Tol Nusa Dua-Ngurah Rai-Benoa).
H.G Poulos & E.H Davis 1988. “Pile Foundation Analysis”.
I.Suryani. Fondasi Cakar Ayam menjabarkan teori Prof. Sedijatmo.
JICA – 1980. “Japan International Corporation Agency”.
Oetomo, Wateno., 2014, Manajemen proyek Konstruksi: Dalam Organisasi Kontemporer, Bagian I. Medisa, Jakarta.
Oetomo, Wateno., 2014, Manajemen proyek Konstruksi: Dalam Organisasi Kontemporer, Bagian II. Medisa, Jakarta.
P.Anas Jurusan Teknik Sipil Universitas Islam Riau, anaspuri@yahoo.com 2015. Studi Parametrik Perkerasan jalan Beton Sistem Plat terpaku pada tanah dasar lunak.
S.Prakash & Hari D. Sharma 1990. “Pile Foundation in Engineering Practice”.
S.Dindin, 2015. Kajian Teknis Perbandingan Penerapan Tipe Konstruksi Cakar ayam Modified, Kontruksi Precast Road On Pile Dan Konstruksi Pile Slab Pada Pembangunan Jalan Tol Simpang Susun Waru juanda Sidoarjo, Jawa Timur.
S.Bambang, C. Hary Hardiyatmo. 2005. Sistem Perkerasan Modifikasi Cakar Ayam (CAM) sebagai alternatif solusi konstruksi jalan diatas tanah lunak, ekspansif, dan timbunan dan Gaya lintang system Cakar Ayam untuk Perencanaan Perkerasan Jalan Beton.
Zan Young Xiang, Yao Hailin, Jian Guan Lu 2013. Design Method of Pile-Slab Structure Roadbed of Ballastless Track on Soil Subgrade.