Analisis Risiko Pada Proyek Konstruksi Pembangunan Gedung Negara Imigrasi Kelas III Non TPI Di Kota Kediri dengan Menggunakan Metode House Of Risk
Abstract
Risk analysis is important in government-funded projects. This research was conducted to determine the risks faced in the construction project of the Non-TPI Class III Immigration State Building in Kediri City. The purpose of this study is to determine the impact of risk by identifying it at the implementation stage, and analyzing risk responses in order to reduce risk. The data analysis used in this study is an analysis using the House of Risk method. Besides that, Mean Analysis and Frequency Analysis will also be used. After processing the data at the house of risk phase 1, 7 priority risk agents were obtained, namely poor project management, poor coordination with the owner, work safety regulations, wrong or incomplete designs, lack of contractor supervision of subcontractors, decreased quality of workers There are 11 priority treatment strategies. The priority of the handling strategy is securing the project location, choosing a competent PM, imposing sanctions on those who violate it, making working drawings, holding frequent meetings, making work implementation schedules, changing work methods to make them faster, accelerating resource procurement, monitoring the performance of subcontractors, implementing K3, and the stock of materials is multiplied.
Downloads
References
Bachtiar, Iwan. 2018. Analisa risiko proyek pembangunan perumahan bumi damai regency di kec. Dander kab. Bojonegoro.
Barrie, D. and Paulson, B.C. (1992). Professional construction management, McGraw-Hill, USA.
Bayu Riski Kristanto dan Ni Luh Putu Harisastuti. 2014. Aplikasi model house of risk untuk mitigasi risiko pada supply chain bahan kulit.
Chapman, R.J. (2001). The controlling influences on effective risk identification and assessment for construction design management, International Journal of Project Management 19
Djohanputro, B. (2008). Manajemen Risiko Korporat. Jakarta: PPM.
Duffield, C & Trigunarsyah, B. 1999.Project Management-Conception to Completion. Engineering Education Australia.(EEA). Australia.
Enma Mediawati Sebayang, Hary Agus Raharjo dan Dwi Diniari. 2018. Pengelolaan Risiko Proyek Gedung Bertingkat pada PT.XYZ di Jakarta terhadap Kinerja Waktu
Fisk, E.R.1997. Construction Project Administration Fifth Edition. Prentice Hall. New Jersey.
Flanagan, R. & Norman, G.1993, Risk Management and Construction. Blackwell Science, London.
Geraldin, L. h, Pujawan N.I. 2009. “ House of Risk: A Model for Proactive Supply Chain Risk Management”, Business Process Management Journal Vol 15. No 6
Hawari, Kahhar. 2018. Identifikasi risiko pada tahap konstuksi bangunan bertingkat 4-20 lantai di jabodetabek dari sudut pandang kontraktor
Jaskowski. P, Biruk. S (2011). “The Conceptual Framework for Construction Project Risk Assessment”.
Kangari, R. 1995. “Risk ManagementPerceptions and Trends of U.S.Construction”. Journal of Construction Engineering and Management
Mhetre K, B.A.Konnur, Amarsinh B. Landage. 2016. “Risk Management in Construction Industry”. International Journal of Engineering Research Vol No.5
Nanda, L., Hartanti, L. P., & Runtuk, J. K. (2014). Analisis Risiko Kualitas Produk dalam Proses Produksi Miniatur Bis dengan Metode Failure Mode and Effect Analysis Pada Usaha Kecil Menengan Niki Kayoe. Gema Aktualita.
Nurlela dan Heri Suprapto. 2013. Indentifikasi Dan Analilisis Manajemen Risiko Pada Proyek Pembanguan Gedung Bertingkat.
Octavio P.M Marques, I M. Alit K. Salain dan I W. Yansen (2014). Manajemen Risiko Pada Pelaksanaan Proyek Kontruksi gedung pemerintah Di Kota Dili
Pujawan, Nyoman I., dan Laudine H. Geraldin. 2009. House of risk: a model for proactive supply chain risk management.
Rifai, Wahyu, 2013. Analisa risiko keterlambatan pelaksanaan konstruksi proyek spazio tower 2 surabaya.
Saniatusilma, H., & Suprayogi, N. (2015). Manajemen Risiko Dana Taabarru' PT. Asuransi Jiwa Syariah Al Amin. JESTT, 1002-1018.
Ulfah, M., Maarif, M. S., Sukardi, & Raharja, S. (2016). Analisis dan Pebaikan Manajemen Risiko Rantai Pasok Gula Rafinasi dengan Pendekatan Hous of Risk. Jurnal Teknologi Industri Pertanian, 87-103.
Waters, J. (2007). Supply Chain Risk Management: Vulnerability and Resilience in Logistics
Wena, Made. 2015. Manajemen Risiko Dalam Proyek Kontruksi