Analysis of Cost and Time of Finishing Work Using Earned Value Method in Multipurpose Building Project in Gresik Regency
Keywords:
architectural work, finishing work, multipurpose building
Abstract
Architectural work in a construction project, generally is a non-structural work. However, the implementation can require a long time and a large cost weight. The implementation of finishing work in multi-purpose building construction project of Gresik Regency that was already running and had problems, that is a lot of workers but lack of work progress, so an increase of the cost from budget planned. Therefore it needs to doing research that for get the actual time of project implementation and get Estimate at Completion (EAC). The results is that the actual time of project implementation is not suitable with time of project planning. The project has been to late so there is a decrease in project performance. In the 1st week of project implementation on time, in the 2nd week until the 15th week the project has been to late (schedule overrun). So based on the time of implementation, the project has decreased performance. The total estimated cost can be seen from the Estimate at Completion (EAC) calculation, which is Rp.274,424,152.89.Downloads
Download data is not yet available.
References
Asmaroni, Dedy dan Aldi Setiawan, 2020. Penggunaan Metode Nilai Hasil (Earned Value Analysis) Terhadap Biaya dan Waktu Pada Proyek Konstruksi Bangunan Perumahan (Studi Kasus Proyek Konstruksi Bangunan Perumahan PT. Graha Praja Kencana di Desa Ceguk Kecamatan Tlanakan Kabupaten Pamekasan). Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, Volume 03, Nomor 01, Maret 2020, ISSN 2615-7195 (E)
Basriati, Sri dan Afri Melda, 2017. Analisis Biaya Pembangunan Proyek Perumahan Menggunakan Metode PERT dan EVM (Studi Kasus: Perumahan D’Lion Cluster). Prosiding SNATIF, ke-4 Tahun 2017. ISBN: 978-602-1180-50-1
Dhawale, Arun and Vaishnavi Tuljapurkar, 2015. Cost Control and Tracking Of A Building By Earned Value Method. International Journal of Technical Research and Applications, e-ISSN: 2320-8163, Volume 3, Issue 2 (Mar-Apr 2015), pp. 15-22
Dipohusodo Ismawan, 1995. Manajemen Proyek dan Konstruksi Jilid 1 dan 2, Kanisius, Yogyakarta.
Ervianto, Wulfram, 2002. Manajemen Proyek Konstruksi, Andi, Yogyakarta.
Gupta, Radhika, 2014, Earned Value Management System. International Journal of Emerging Engineering Research and Technology, Volume 2, Issue 4, July 2014, PP 160-165ISSN 2349-4395 (Print) & ISSN 2349-4409
Hidayat, M. Zaki dan Umi Marfuah, 2017. Penerapan Project Control Process Dengan Metode Earned Value Manajemen Pada Proyek Pengadaan Kelambu Berinsektisida (Studi Kasus PT. Adiwara Worldwide). Jurnal Integrasi Sistem Industri, Volume 4 No. 1 Februari 2017
Natalia, Monika, Merley Misriani, Zulfira Mirani, Yan Partawijaya dan Nadia Hidayah. 2019. Analisis dan Evaluasi Kinerja Proyek Pembangunan Gedung Shelter SDN 27 Lengayang Pesisir Selatan dengan Metode Earned Value, Jurnal Teknik Sipil ITP, Vol. 6 No.2 Juli 2019. P-ISSN 2354-8452, E-ISSN 2614-414X, DOI: 10.21063/JTS.2019.V602.05.
Pancaningrum, Endar, Widi Hartono dan Sugiyarto, (2018). Pengendalian Biaya Dan Waktu Dengan Menerapkan Metode Earned Value Analysis (Eva) Menggunakan Software Microsoft Project 2007 (Studi Kasus Di Proyek Pembangunan Hotel Brothers 2 Solo Baru, Sukoharjo). e-Jurnal Matriks Teknik Sipil, no.3, Maret 2018
Soeharto, Iman, 1998. Manajemen Proyek:Dari Konseptual Sampai Operasional, Jilid I Erlangga, Jakarta.
Soeharto, Iman, 2001. Manajemen Proyek, Erlangga, Jakarta.
Sufa’atin, 2017. Penerapan Metode Earned Value Management (EVM) Dalam Pengendalian Biaya Proyek. Prosiding SNATIF, ke-4 Tahun 2017. ISBN: 978-602-1180-50-1
Wahyuni, Elvi dan Bambang Hendrawan, (2018). Analisis Kinerja Proyek “Y”Menggunakan Metode Earned Value Management (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration Vol 2, No 1, Maret 2018, hlm. 60-78 e-ISSN:25489909.
Witjaksana, B., & Reresi, S. P. (2012). Analisis Biaya Proyek Dengan Metode Earned Value Dalam Proses Kinerja. Jurnal Teknik Sipil Untag Surabaya.
Basriati, Sri dan Afri Melda, 2017. Analisis Biaya Pembangunan Proyek Perumahan Menggunakan Metode PERT dan EVM (Studi Kasus: Perumahan D’Lion Cluster). Prosiding SNATIF, ke-4 Tahun 2017. ISBN: 978-602-1180-50-1
Dhawale, Arun and Vaishnavi Tuljapurkar, 2015. Cost Control and Tracking Of A Building By Earned Value Method. International Journal of Technical Research and Applications, e-ISSN: 2320-8163, Volume 3, Issue 2 (Mar-Apr 2015), pp. 15-22
Dipohusodo Ismawan, 1995. Manajemen Proyek dan Konstruksi Jilid 1 dan 2, Kanisius, Yogyakarta.
Ervianto, Wulfram, 2002. Manajemen Proyek Konstruksi, Andi, Yogyakarta.
Gupta, Radhika, 2014, Earned Value Management System. International Journal of Emerging Engineering Research and Technology, Volume 2, Issue 4, July 2014, PP 160-165ISSN 2349-4395 (Print) & ISSN 2349-4409
Hidayat, M. Zaki dan Umi Marfuah, 2017. Penerapan Project Control Process Dengan Metode Earned Value Manajemen Pada Proyek Pengadaan Kelambu Berinsektisida (Studi Kasus PT. Adiwara Worldwide). Jurnal Integrasi Sistem Industri, Volume 4 No. 1 Februari 2017
Natalia, Monika, Merley Misriani, Zulfira Mirani, Yan Partawijaya dan Nadia Hidayah. 2019. Analisis dan Evaluasi Kinerja Proyek Pembangunan Gedung Shelter SDN 27 Lengayang Pesisir Selatan dengan Metode Earned Value, Jurnal Teknik Sipil ITP, Vol. 6 No.2 Juli 2019. P-ISSN 2354-8452, E-ISSN 2614-414X, DOI: 10.21063/JTS.2019.V602.05.
Pancaningrum, Endar, Widi Hartono dan Sugiyarto, (2018). Pengendalian Biaya Dan Waktu Dengan Menerapkan Metode Earned Value Analysis (Eva) Menggunakan Software Microsoft Project 2007 (Studi Kasus Di Proyek Pembangunan Hotel Brothers 2 Solo Baru, Sukoharjo). e-Jurnal Matriks Teknik Sipil, no.3, Maret 2018
Soeharto, Iman, 1998. Manajemen Proyek:Dari Konseptual Sampai Operasional, Jilid I Erlangga, Jakarta.
Soeharto, Iman, 2001. Manajemen Proyek, Erlangga, Jakarta.
Sufa’atin, 2017. Penerapan Metode Earned Value Management (EVM) Dalam Pengendalian Biaya Proyek. Prosiding SNATIF, ke-4 Tahun 2017. ISBN: 978-602-1180-50-1
Wahyuni, Elvi dan Bambang Hendrawan, (2018). Analisis Kinerja Proyek “Y”Menggunakan Metode Earned Value Management (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration Vol 2, No 1, Maret 2018, hlm. 60-78 e-ISSN:25489909.
Witjaksana, B., & Reresi, S. P. (2012). Analisis Biaya Proyek Dengan Metode Earned Value Dalam Proses Kinerja. Jurnal Teknik Sipil Untag Surabaya.

Published
2025-04-29
Issue
Section
Articles
Copyright (c) 2025 Jurnal Spesialis Teknik Sipil (JSpTS)

This work is licensed under a Creative Commons Attribution 4.0 International License.