rasa4d rasa4d rasa4d rasa4d rasa4d rasa4d slot thailand rasa4d toto slot toto slot rasa4d rasa4d rasa4d rasa4d rasa4d winsortoto toto winsortoto toto toto winsortoto jaja tequila toto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto toto toto toto slot winsortoto toto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto winsortoto gampangtoto gampangtoto gampangtoto gampangtoto gampangtoto gampangtoto gampangtoto gampangtoto toto gampangtoto gampangtoto bungtoto bungtoto bungtoto bungtoto bungtoto bungtoto rasa4d rasa4d rasa4d rasa4d slot gacor rasa4d rasa4d slot gacor toto slot gampangtoto situs toto rasa4d gampangtoto situs toto bungtoto toto slot toto slot toto slot unsurtoto unsurtoto gampangtoto situs toto gampangtoto slot gacor rasa4d rasa4d situs toto winsortoto winsortoto slot gacor rasa4d toto slot rasa4d gampangtoto toto rasa4d slot gacor winsortoto rasa4d rasa4d slot gacor slot gacor
Skip to main content Skip to main navigation menu Skip to site footer
  • Home
  • Current
  • Archives
  • Announcements
  • About
    • Publication Ethic
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
Search
  • Register
  • Login
Search
  1. Home /
  2. Archives /
  3. Vol. 6 No. 1 (2025)

Vol. 6 No. 1 (2025)

					View Vol. 6 No. 1 (2025)
DOI: https://doi.org/10.30996/jspts.v6i1
Published: 2025-04-29

Articles

  • Crashing Analysis of Repeated Work Implementation on Housing Projects Using the LoB (Line of Balance) Method Case Study of Bumi Podo Rukun Housing

    Indah Fadjarwati, Wateno Oetomo, Herry Widhiarto
    • PDF (Bahasa Indonesia)
  • Analysis of Aquifer Potential Prediction Using Geoelectric Resistivity Sounding Method (Case Study in Mojokerto Regency)

    Luthfil Abid, Laksono Djoko Nugroho, Sajiyo Sajiyo
    • PDF (Bahasa Indonesia)
  • Analysis of Factors Causing Iron Waste and Mitigation in the KLBM Toll Project (Krian Legundi Bunder Manyar)

    Muhammad Alvan Rizki, Sri Wiwoho Mudjanarko, Muslimin Abdulrahim
    • PDF (Bahasa Indonesia)
  • Analysis of Cost and Time of Finishing Work Using Earned Value Method in Multipurpose Building Project in Gresik Regency

    Muhammad Wahyudi, Wateno Oetomo, Sri Wiwoho Mudjanarko
    • PDF (Bahasa Indonesia)
  • Earthquake Impact Planning for Cultural Heritage Buildings, Mini Banda Palace, Banda Neira Island Area

    Angel Rumihin, Ony Frengky Rumihin
    • PDF (Bahasa Indonesia)

Current Issue

  • Atom logo
  • RSS2 logo
  • RSS1 logo

JOURNAL TEMPLATE

Download Template Artikel

ADDITIONAL MENU

 Plagiarism Screening Focus & Scope Peer Review Process Author Fees Editorial Team  Reviewer  Author Guidelines Publication Ethics Online Submissions  Copyright Notice  Indexing Open Access Policy

INFORMATION

 Reader  Author  Librarians

ISSN

BARCODE

TOOLS


COLLABORATION

CITATION

VISITORS

Flag Counter

SOCIAL MEDIA

 Instagram
Published by:
Program Studi Magister Teknik Sipil Universitas 17 Agustus 1945 Surabaya

Editorial Address:
Jl. Semolowaru 45 Surabaya Jawa Timur 60118 Indonesia

Email : jspts@untag-sby.ac.id


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Web Analytics Made Easy - Statcounter View My Stats

More information about the publishing system, Platform and Workflow by OJS/PKP.