EVALUASI PROYEK REHABILITASI PEMBANGUNAN GEDUNG DI TINJAU BERDASARKAN WAKTU DAN BIAYA PENGERJAAN (Studi Kasus : Proyek Pembangunan MTsN Paron Kab. Ngawi)
Abstract
The development of construction project currently becomes a more complicated case. The implementation of construction project is a series of interdependent activity through project management system from plan stage up to the implementation itself. The project management system involves the workforce, cost, time, equipment and others , and also schedule delay which effects cost consumming that must be ignored. This study analysis how to determine optimal project time & cost. This case study is performed on the renovation of MTsN Paron Ngawi Regency building. The secondary data involves project cost estimate, time schedule, price analysis list of materials and wages which are analysed further by acceleration crashing methode and overtime extention. From the acceleration process , proved that optimal project time of MTsN Paron Ngawi Regency renovation project is done by expediting the time into 56 days, while the total amount of optimal project cost is Rp. 194,041,862.00. The most optimal option of the acceleration is the augment of overtime, 1 hour, which generates project efficiency 0.35 %.
Key words : time-cost trade off, optimal project cost, project management, crashing
Downloads
References
D Orr, Alan,(2012), Manajemen Proyek Lanjutan Pedoman Lengkap Proses, Model dan Teknik-Teknik Utama, Indeks Jakarta.
Eka Dannyanti, Optimalisasi Pelaksanaan Proyek dengan Metode Pert dan CPM (Studi Kasus Twin Tower Building Pasca Sarjana Undip. Universitas Diponegoro, 2010.
Gray, Larson, (2006), Project Management, The Managerial Process-International Edition, McGraw-Hill.
Husen, Abrar, (2010), Manajemen Proyek : Perencanaan,Penjadwalan dan Pengendalian, Andi, Yogyakarta.
Irika Widiasanti &Lenggogeni (2013) Manajemen Konstruksi, Rosda, Jakarta.
Simanjuntak P., Gray C.,dkk, 1992. Pengantar Evaluasi Proyek. Jilid II, Penerbit Gramedia Pustaka, Jakarta.
Soedrajat, Sastramadja. 1994. Analisa (Cara Modern)Anggaran Biaya Pelaksanaan, Penerbit Nova, Bandung.
Suharto, Iman, (1995), Manajemen Proyek : Dari Konseptual sampai Operasional, Erlangga, Jakarta.
Tarore H., 2001. Analisis Sistem Rekayasa Konstruksi (ASREKO). Sam Ratulangi University Press, Manado.
Tarore H., 2002. Jaringan Kerja Dengan Metode CPM, PERT, PDM. Edisi Pertama, Sam RatulangiUniversity Press, Manado.
Yohanes L.D. Adianto, Ali Maliki, Wisnu Prasetyo. Analisis Biaya dan Waktu Optimal pada Proyek Ruko Paskal Hypersquare dengan Least Cost Scheduling.Volume 14, No. 1 Edisi XXXIV Pebruari 2006.
Authors who publish with Extrapolasi agree to the following terms:
- Authors transfer the copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access)