Skip to main content
Skip to main navigation menu
Skip to site footer
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Team
Privacy Statement
Contact
Search
Search
Register
Login
Home
/
Archives
/
Vol 8 No 01 (2015)
DOI:
https://doi.org/10.30996/exp.v8i01
Published:
2017-03-19
ALTERNATIF PENERAPAN METODE CRASH PROGRAM PROYEK PEMBANGUNAN GEDUNG PASCA SARJANA STTAL KOBANGDIKAL SURABAYA
* *
* Kusnan . *
*
Kusnan .,
Indonesia
DOI :
https://doi.org/10.30996/exp.v8i01.973
OPTIMALISASI WAKTU DAN BIAYA DENGAN LINEAR SCHEDULING METHOD PADA PROYEK PEMBANGUNAN GEDUNG ARSIP DINAS PEKERJAAN UMUM KALIMANTAN TENGAH DI PALANGKA RAYA
* *
* Syayuti . *
*
Syayuti .,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.974
ANALISIS INVESTASI PEMBANGUNAN KOMPLEK VILA SWAGRIYA DI NYANYI TABANAN
* *
* I Wayan Gunawan *
*
I Wayan Gunawan,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.975
ANALISIS INVESTASI ALAT BERAT PADA PEKERJAAN PENGASPALAN JALAN LAPIS PENETRASI MACADAM DI KABUPATEN BUTON UTARA SULAWESI TENGGARA
* *
* Syamsul Bahri Bahar *
*
Syamsul Bahri Bahar,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.976
VALUE ENGINEERING ANTARA PERANCAH KONVENSIONAL DENGAN SCALFOLDING PADA PROYEK KONTRUKSI (Studi Kasus pada Gedung Bertingkat di SMPN 10 Denpasar Bali)
* *
* I NYOMAN ASTINA *
*
I NYOMAN ASTINA,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.977
ANALISIS KELAYAKAN INVESTASI KOMPLEK PERTOKOAN DI JALAN RAYA PETITENGET KEROBOKAN KUTA-BALI
* *
* I Dewa Made Sumayasa *
*
I Dewa Made Sumayasa,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.978
ANALISIS KELAYAKAN INVESTASI PASAR TRADISIONAL DESA PADANGSAMBIAN DI DENPASAR BALI
* *
* I MADE PUJA *
*
I MADE PUJA,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.979
KAJIAN TERHADAP RESIKO KUALITAS HUBUNGAN KONTRAKTUAL ANTARA KONTRAKTOR DAN SUBKONTRAKTOR BERKAITAN DENGAN PEKERJAAN SPESIALIS PADA PROYEK KONSTRUKSI
* *
* Wateno Oetomo *
*
Wateno Oetomo,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.980
ANALISIS KELAYAKAN INVESTASI PEMBANGUNAN PERUMAHAN DI TABANAN BALI
* *
* I Wayan Parwata *
*
I Wayan Parwata,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.981
ANALISIS PENGGUNAAN PONDASI MINI PILE DAN PONDASI BORPILE TERHADAP BIAYA DAN WAKTU PELAKSANAAN PEMBANGUNAN RUANG KELAS SMPN 10 DENPASAR
* *
* Juniada Pagehgiri *
*
Juniada Pagehgiri,
Indonesia
PDF
DOI :
https://doi.org/10.30996/exp.v8i01.982
Information
For Readers
For Authors
For Librarians
Additional Menu
Focus and Scope
Editorial Team
Reviewer
Author Guidelines
Peer Review Process
Publication Ethics
Online Submission
Copyright Notice
Plagiarism Policy
Indexing
Author Fees
Open Access Policy
Visitor Statistics
ISSN
ACCREDITATION
SINTA
Journal Template
Visitors
COLLABORATION